Economic Indexes of an Expressway Project in Guangdong

Date:

2023-08-22
Views:

These indexes are related to the quantity and cost of structures for a certain expressway project.


Subgrade

Length of main 

line(km)

94.42

Prestressed concrete hollow slab bridg

Length (m)

318.81

Construction and installation cost 

index

(RMB 10,000/m)

1.72 

Construction and installation cost index

(RMB 10,000/m)

11.53 

Prestressed concrete T-shaped girder bridge

Length (m)

97.32

Prestressed concrete box girder bridge

Length (m)

645.45 

Construction and installation cost index

(RMB 10,000/m)

6.93

Construction and installation cost index

(RMB 10,000/m)

9.76 

Reinforced concrete pipe culvert

Length (m)

171.59

Slab culvert

Length (m)

16,917.81 

Construction and installation cost index

(RMB 10,000/m)

0.19 

Construction and installation cost index

(RMB 10,000/m)

0.91 

Separated tunnel works

Length (m)

10,399.00 

Super major and major bridge works on the main line 

(100≤L,40≤Lk)

Length (m)

24,664.23 

Quantity (Nr.)

9.00 

Quantity (Nr.)

56.00 

Construction and installation cost index

(RMB 10,000/m)

14.26 

Construction and installation cost index

(RMB 10,000/m)

9.30